To accommodate the additional stormwater run-off created by the road widening a detention basin is proposed on the Reconstructionist Rabbinical College property along the east side of Greenwood Avenue. A mantenence road will be created and a 15' section of the the existing wall along Greenwood Avenue will be removed to provide access.
PennDOT Church Road
Improvement Project:
Greenwood Ave. to
Rices Mill Rd.
All of the technical drawings and photographs on this and other related pages are from the PennDOT Powerpoint presentation at the April 13, 2018 Consulting Parties Meeting or the from April 4, 2019 PennDOT Open House, as was any related information.
Stormwater Management
Detention Basin